26 Building Webster’s Lab V2 – Advice, Conclusions, and Lessons Learned
[Updated 8-Nov-2021] If you have followed this series, we have learned a lot together. I started working on this series on 4-Apr-2021 and finished this, the last article, on 28-Jun-2021. Then, from 27
-
25 Building Webster’s Lab V2 – Update ESXi Hosts using VMware Lifecycle Manager
June 25, 2021
[Updated 29-Aug-2021] Previous to vCenter 7, VMware used Update Manager to enable centralized patch management for ESXi hosts. In vCenter, VMware introduced Lifecycle Manager. Lifecycle Manager offers
-
24 Building Webster’s Lab V2 – Create a ControlUp Management Server
June 24, 2021
[Updated 8-Nov-2021] The next step is to create an additional management server VM from the Server 2019 template. We use the VM built in this article for an additional infrastructure server. My Lab
-
23 Building Webster’s Lab V2 – Create an IGEL Management Server
June 23, 2021
[Updated 8-Nov-2021] The next step is to create an additional management server VM from the Server 2019 template. We use the VM built in this article for an additional infrastructure server. My lab
-
22 Building Webster’s Lab V2 – Create a Goliath Technologies Management Server
June 22, 2021
[Updated 8-Nov-2021] The next step is to create an additional management server VM from the Server 2019 template. We use the VM built in this article for an additional infrastructure server. My lab
-
21 Building Webster’s Lab V2 – Create a 10ZiG Management Server
June 21, 2021
[Updated 8-Nov-2021] The next step is to create an additional management server VM from the Server 2019 template. We use the VM built in this article for an additional infrastructure server. My lab
-
20 Building Webster’s Lab V2 – Create a Management Computer
June 18, 2021
[Updated 8-Nov-2021] The next step is to create a management computer from the Windows 10 template with the additional servers built and configured. We use the VM built in this article for PowerShell
-
19 Building Webster’s Lab V2 – Create Additional Servers
June 17, 2021
[Updated 8-Nov-2021] With the base of the Vmware infrastructure, Active Directory (AD), Certification Authority (CA), and Group Policy (GPO) built, the next step is to create additional server VMs fro
-
18 Building Webster’s Lab V2 – Additional XenCenter Configuration
June 16, 2021
Before getting to work adding Citrix Virtual Apps and Desktops (CVAD) and VMware Horizon to the lab, a few additional items are on the XenCenter to-do list. Update DNS server entries for each XenServ
-
17 Building Webster’s Lab V2 – Additional vCenter Configuration
June 15, 2021
[Updated 29-Aug-2021] Before getting to work adding Citrix Virtual Apps and Desktops (CVAD), and VMware Horizon to the lab, there are a few additional items on the vCenter to-do list. Join vCenter to
-
16 Building Webster’s Lab V2 – Create Initial Group Policy Objects
June 14, 2021
[Updated 8-Nov-2021] With the domain controllers built, Active Directory (AD) configured, and the Certificate Authority Server configured, the next step is to create the initial settings within Group
-
15 Building Webster’s Lab V2 – Create a Microsoft Certificate Authority
June 11, 2021
[Updated 8-Nov-2021] With the Server 2019 VM built for the certificate authority, the next step is to create the Certificate Authority (CA). To make sure you understand what I cover in this article,
-
14 Building Webster’s Lab V2 – Create Active Directory
June 10, 2021
[Updated 22-Sep-2021] With the two Server 2019 VMs built for domain controllers, the next step is to create Active Directory (AD). To make sure you understand what I cover in this article, you shoul
-
13 Building Webster’s Lab V2 – Create VMs from the Server 2019 Template
June 9, 2021
[Updated 28-Aug-2021] With the Server 2019 template created, the next step is to create VMs from the template. We use the VMs built in this article for the first three Microsoft infrastructure servers
-
12 Building Webster’s Lab V2 – Create a Server 2019 Template Image
June 8, 2021
[Updated 28-Aug-2021] With both VMware vSphere and vCenter and Citrix XenServer and XenCenter installed and basic configuration completed, the next step is to create a Windows Server 2019 master image
-
11 Building Webster’s Lab V2 – Citrix XenServer Host and Pool Configuration
June 7, 2021
[Updated 8-Nov-2021] Now that you have installed the XenServer host, the host’s configuration can begin. As stated in the Introduction article, Citrix uses XenCenter to manage one or more XenSer
-
10 Building Webster’s Lab V2 – Install Citrix XenServer 8.2
June 4, 2021
[Updated 8-Nov-2021] Installing Citrix Hypervisor (XenServer) 8.2 is easy as there are not many options. It is almost a “Next, Next, Install, Finish, Reboot” process. The first thing is to
-
09 Building Webster’s Lab V2 – Updating the vCenter Server Appliance
June 3, 2021
[Updated 8-Nov-2021] The vCenter Server Appliance (VCSA), like all software, receives updates. The VCSA makes it drop-dead simple to update. Before you start: Clear your browser’s cookies and c
-
08 Building Webster’s Lab V2 – Backup the vCenter Server Appliance using NFS
June 2, 2021
[Updated 28-Aug-2021] It is essential to have a backup of all critical data, servers, and Virtual Machines, whether in a lab or production environment. Before making significant changes to the vCenter
-
07 Building Webster’s Lab V2 – Create vSphere Networking and Network Storage
June 1, 2021
[Updated 8-Nov-2021] Before creating a vSphere Distributed Switch (vDS), we need to create a Datacenter. Verify you are connected and logged in to the vCenter console. Click Menu and click VMs and Tem
June 28, 2021